New Trunk and Distribution Water Main and Infrastructure Upgrades Along 33rd Avenue and Surrounding Areas, Bayside and Flushing Queens Project ID: QED991 Summer 2017-Summer 2021 Broadway-Flushing Homeowners Association Date: 10/25/18 Church on the Hill 167-03 35th Avenue Flushing, NY 11358

NYC CRITICAL INFRASTRUCTURE ASSETS* 322 square miles - City area 6,375 miles of streets 6,417 miles of sewers 144,000 Catch Basins 6,134 miles of water mains 14 miles of public Beaches 520 miles of water front 149 miles of interceptor sewers 14,000 acres of Staten Island "Blue Belt" storm water management system (BMP) 2,000 square miles of watershed 19 Clean Water Reservoirs; 3 controlled lakes

580 billion gallons drinking water storage capacity 700 miles of subway 90,000 miles underground power cables 14 Wastewater Treatment Plants 2,000 bridges and tunnels 5.2 million trees 6,000 acres of wetlands (PARSONS)* WHY IS THIS PROJECT NECESSARY?

This Project is Necessary To: Upgrade trunk water main distribution network system Reinforcing the transmission (High Pressure) system Upgrading the watermain network distribution system by connecting two end points of the existing system from Flushing to Bayside.

Improve water distribution grid system This system is being supplied by the transmission or trunk or high pressure water main distribution system. This network comprises a grid of distribution water mains with pipes diameter ranging from 8, 12, 20, and 24. The existing mains are from 1912 to 1940, they are C.I.P ( Cast Iron Pipe with lead joint) and reaching their useful. They will be replaced with Ductile Iron Pipe, more resilient with no lead joint. Ensure proper delivery of necessary services Delivering proper, clean and adequate water to the businesses, residents and fire fighting department.

Upgrade sanitary and storm sewer Updating the sewer will increase the system drainage capacity and help reducing flooding in the neighborhood. in 33rd Ave and surrounding areas Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18

a total cost of $47.3 billion over the next four to five years. And this only reflects repairing and maintaining current infrastructurenot needed service expansions such as building new sewers or bus rapid transit lines. Water main Break Rehabilitation 5th Ave & 20th St, Manhattan, Jan 2 1998 Water Main Break Water Main Rehabilitation

January 17, 2014 CI WM Break (Manhattan) Water Main Break Floods Flatiron District (2013) A massive water main break in Flatiron sent water cascading into a subway station at Broadway and 23rd St. late Friday morning, leading portions of the N and Q lines to be closed all afternoon. The main a 36-inch pipe dating to 1915 ruptured at 24th St. and Broadway about 10:45 a.m. Friday, February 1, 2013, flooding area streets and sending water

rushing down into the subway system. The MTA says N/Q service is suspended between De Kalb and 57th and 7th or R service between Queens Plaza and Whitehall as the power has been turned off at the flooded station. Also? Expect a lot of traffic around Madison Square Park today. Massive water main break drenches a subway station in Flatiron, knocking out service on the N and Q lines for hours The break was at 24th St. and Broadway, and sent water flooding down into the

subway station at 23rd St. and Broadway. Normal service has been restored normal service was restored on the N, Q, B and D lines. The R train is running on alternate lines. By Pete Donohue / NEW YORK DAILY NEWS Friday, February 1, 2013, 1:46 PM Lisa Marie Pompilio Street Flooding inadequate drainage (Queens)

Sink Hole cause by underground sewer collapse (Brooklyn) July 18, 2007, 6:18 pm Steam Pipe Explosion Jolts Midtown A view of the hole created by the explosion at Lexington Avenue near Grand Central Station. (Photo: Peter Foley/European Press photo Agency) Electric manhole fire-30-83 Crescent St (Queens) SCOPE OF WORK TO BE PERFORMED Project Scope Replacement of :

14,000 linear feet of Trunk Water Main 72, 60 & 48 23,500 linear feet of Distribution Water main 20, 12 & 8 4,200 linear feet of Sanitary Sewer 10, 12 500 linear fee of Storm Sewer 12, 18 and 3,000 linear feet of Combined Sewer 15, 16 18, 24 & 30

Utility Relocation Work DOT Roadway and Traffic Improvement in 33rd Ave and surrounding areas Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 WHERE WILL THE WORK BE PERFORMED?

PROJECT LOCATION Bayside -38th Ave from 216th St. to Francis Lewis Blvd. -216th St. from 38th Ave. to 40th Ave. Flushing -33rd Ave. from 156th St. to Francis Lewis Blvd. -Utopia Pkwy. from 33rd Ave. to 37th Ave. -37th Ave. from Utopia Pkwy. to Francis

Lewis Blvd. in 33rd Ave and surrounding areas Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 Bayside: 38th Ave between Bell Blvd. and 213th Street in 33rd Ave and surrounding areas

Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 Flushing in 33rd Ave and surrounding areas Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18

Flushing Con-Edison Gas relocation in 33rd Ave and surrounding areas Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 Project Sequence Phase #1:

Summer 2018-Spring 2019 a. 216th Street from 40th Avenue to 38th Ave b. 38th Avenue from 216th Street to Clearview Expressway Phase#2: Spring 2019-Winter 2020 38th Avenue from Clearview Expressway to Utopia Parkway Phase#3: Winter 2020-Summer 2021 c. Utopia Parkway from 37th Avenue to 33rd Avenue d. 33rd Ave from 156th Street to Francis Lewis Boulevard ** Please note that these dates are approximate and are subject to change due to weather and unforeseen field conditions

in 33rd Ave and surrounding areas Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 WORKING HOURS AND TRAFFIC STIPULATIONS Bayside and Flushing areas NYC-DOT OCMC (Office of Construction Mitigation and Coordination)

permitted work hours: 7:00 am to 6:00 pm, Monday through Friday Weekend and nights as needed in 33rd Ave and surrounding areas Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 Traffic Stipulations Contractor shall maintain (1) 12 foot lane for local and emergency traffic

during working hours. Contractor shall maintain (1) 11 foot lane on one way streets and (2) 11 foot lanes on two way streets, where possible. Contractor must maintain a 5 foot clear sidewalk for pedestrians at all times in 33rd Ave and surrounding areas Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18

COMMUNITY IMPACTS COMMUNITY IMPACTS Water Service Interruptions Scheduled water service interruptions. 72 hours and 24 hours prior advance notice with instructions will be provided. If your water service is not restored by the time indicated on the Shutoff Notice, please contact the Community Construction Liaison (CCL) or 311 if after hours. in 33rd Ave and surrounding areas

Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 COMMUNITY IMPACTS 72 Hour Water Community Advisory M A S Main in 33rd Ave and surrounding areas

E L P Project Title: Trunk and Distribution Water Project ID: QED991 10/25/18 COMMUNITY IMPACTS 24 Hour Water Community Notice M A

S in 33rd Ave and surrounding areas E L P Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 COMMUNITY IMPACTS Pedestrian and Traffic

Interruptions The DDC is committed to maintaining a work site that is safe and clean Pedestrian/Traffic Pedestrian access to buildings will be maintained at all times Street Closures may be required -Warning signs will be posted Driveway access and curbside parking may be temporarily restricted during construction Parking may be temporarily restricted -Signs will be posted where necessary and advance notification provided in 33rd Ave and surrounding areas

Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 COMMUNITY IMPACTS No-Parking/Tow Away Notice M A S in 33rd Ave and surrounding areas

E L P Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 COMMUNITY OUTREACH Weekly Construction Bulletin M A

S Main in 33rd Ave and surrounding areas E L P Project Title: Trunk and Distribution Water Project ID: QED991 10/25/18 COMMUNITY OUTREACH E

L P M A S in 33rd Ave and surrounding areas On Site Community Construction Liaison Project Information card Newsletters Email alerts On going communication with

Community Board 7 and other Stakeholders. Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 COMMUNITY IMPACTS Rodent Control Rodent Survey will be performed by a licensed exterminator prior to construction The contractor will be baiting within the construction zone as required by the contract Rodent Control Stations will be installed and monitored by a professional rodent control specialist Special Needs

Individual with special needs should contact the Community Construction (CCL) The DDC field staff will work specifically with those individuals to minimize the inconvenience in 33rd Ave and surrounding areas Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 KEEPING YOU INFORMED The DDC has assigned Tanya Pazmino as the on-site Community Construction Liaison (CCL) to:

Keep Stakeholders informed by being the first point of contact for the project. Identify and resolve issues Provide regular updates and advisories The CCL contact information: Office Phone:347-235-0412 Mobile: 917-843-2686 Email: [email protected] Field Office: 200-20 44th Ave 1st Floor, Bayside, NY 11361 The DDC Website: www.nyc.gov/DDC During non-working hours, please call 311 and give the Project ID:QED991 in 33rd Ave and surrounding areas

Project Title: Trunk and Distribution Water Main Project ID: QED991 10/25/18 QUESTION & ANSWERS

Recently Viewed Presentations

  • GROSS ANATOMY OF THE LIVER - Med Study Group

    GROSS ANATOMY OF THE LIVER - Med Study Group

    Liver & Gallbladder Lymphatic Drainage of spleen The lymph vessels emerge from the hilum and pass through a few lymph nodes along the course of the splenic artery and then drain into the celiac nodes.
  • Brave New World Study Questions Community, Identity, Stability!

    Brave New World Study Questions Community, Identity, Stability!

    It changed what people sought to give life meaning, from knowledge and truth to happiness and comfort. Chapters XIV - XVII . 8. What right does John claim? John claims the right to be unhappy, if that is what Mond...
  • The Life Cycle of a Butterfly Learn about

    The Life Cycle of a Butterfly Learn about

    The Life Cycle of a Butterfly Learn about the Life cycle The Cycle Egg Caterpillar Pupa Butterfly Test your knowledge The Egg A butterfly lays an egg on a plant leaf The caterpillar grows inside Return to Life cycle The...
  • Development of Latent Prints

    Development of Latent Prints

    Images and other multimedia content used with permission. Fingerprint Chemicals (continued) Gentian violet (or crystal violet) - used for developing latent prints on the adhesive side of tape.
  • JPSS Cloud Products Quick Guides Cloud Top Altitude

    JPSS Cloud Products Quick Guides Cloud Top Altitude

    The Aviation Weather Center (AWC) began to demonstrate ACHA products in 2012. From this initial evaluation, the CTA was requested as feet are the units in aviation forecasting. From this, the request for Cloud Cover Layers (CCL) was born.
  • Gaussian03、ChemOffice2004新功能演示

    Gaussian03、ChemOffice2004新功能演示

    常用化学软件新版本简介 北京宏剑科迅计算机技术中心 Beijing Hong-cam Computer Technologies Center Name=Structure Name=Structure Gaussian03 ...
  • Forest Monitoring of the Congo Basin using Synthetic

    Forest Monitoring of the Congo Basin using Synthetic

    Congo Basin Background. Area drained by the Congo River ~3.8 million km2. 1.5 million km2 tropical forest. Swamp forests - mountain ecosystems. 2nd largest rainforest
  • Daoism, Legalism & Confucianism

    Daoism, Legalism & Confucianism

    Daoism, Legalism & Confucianism Three Philosophies that look at how to get people to behave and how the government should rule the people. Daoism/Taoism Daoism/Taoism Started by a man named Lao Tsu who lived about 600 BC Is a philosophy...