DESIGNING SALTWATER DISPOSAL SYSTEMS FOR OPTIMAL OIL RECOVERY AND MINIMUM MAINTENANCE Kirby Mohr, P.E. Mohr Separations Research, Inc. Lewisville, TX Website: oilandwaterseparator.com email: [email protected] oilandwaterseparator.com

Introduction - Need for Better Salt Water Treatment 1. Resource Recovery can sell any captured oil 2. Avoid primary plugging of down-hole areas by oil 3. Avoid secondary plugging by bacterial growth Two Sets of Separation

Equipment Required Primary separation at or near the wellhead Usually pressurized May or may not be equipped with sand removal systems May include heater-treaters Salt water disposal system for recovering residual oil

Wellhead Typical Three Phase Separator Typical Gunbarrel Separator Wellhead Separation Equipment Three phase separators Good rough-cut separation system

Gunbarrel separators Mostly empty tank type system Both are relatively inexpensive, lowmaintenance and simple to operate Neither are designed to capture small oil droplets and not very efficient Separation by Gravity Separation governed by Stokess Law

V p G (d p d c ) D 18 2 Stokess Law Variables Variables are Density of Droplets Density of the Water

Viscosity of continuous phase (temperature) Average Droplet size (Squared function) Stokess Assumptions

Laminar Flow Consistent specific gravity Spherical Particles Consistent particle size Droplets are large enough to avoid Brownian Motion flow regime Information needed for Disposal System Design

Design flow rate

Design inlet oil content and gravity Design water specific gravity Design operating temperature range Oil outlet concentration desired Design solids content Design solids type / configuration Possible variations in the parameters Design Flow Rate Design flow rate determined on an

instantaneous (gpm or equal) basis BPD if 24 hour operation 30,000 -36,000 BPD is a reasonable large size For larger flows, use multiple units Design for maximum flow expected performance will be better at lower flows Design Inlet oil Content /

Specific Gravity If analyses are available, use highest oil content found. If no analyses, use 5% as maximum oil content. If specific gravity is available, use that If gravity is unknown, use literature value for that field or get a sample tested Design Operating Water

Temperature In general, higher temperature is better up to about 150 F (65 C). Higher water temperature is better because the viscosity of the water is less at higher temperature But, at higher temperatures convection and other currents will be worse and may cause separation problems. Check with the possible water sources for temperatures

Design Oil Removal Cant get to ZERO ppm oil in effluent, but can get to non-detect levels (about 2 ppm) Better oil removal brings more oil to sell and also reduces operating costs Can only get down to droplets about 10-15 micrometers in diameter (Brownian Motion) Volume of oil in a droplet depends on the cube of the diameter

Design Inlet Solids Content Solid content in the inlet will vary wildly from one truck to the next Take samples for analysis if possible. If it is not possible to get samples for analysis, estimate 50 ppm solids. If the solids content is eventually proven to be more, add solids settling capacity

Variations in Parameters Some parameters are not likely to change substantially: Oil specific gravity Removal required Some parameters will change substantially: Flow rate Operating water temperature

Design choices Instantaneous flow rate Surge capacity / solids and oil retention volume Piping sizes Flow Scheme and Separations system Can centrifugal pumps be avoided? Instantaneous flow rate

Treatment systems operate on an instantaneous basis not a barrels per year basis This basis should be determined using the maximum flow expected Tank Capacity Inlet tank capacity should be sufficient to contain: Water to allow for up to two days of operation

Oil content of up to 5% for two days of operation Solids storage sufficient for 50 mg/l for two days of operation Total = sum of above Piping Flow Capacity Make sure the piping system from the inlet of the overall system to the injection pump is

large enough for the flow Use large pipe to avoid pressure drops which cost energy and degrade droplet size distributions If piping is too small, water will back up in the inlet tankage Avoid centrifugal pumps if possible Separation System Design Systems should be designed to remove

substantially all of the oil present in the inlet Coalescing plate separators work well Really good oil removal will preclude bacterial growth in the system, final filter, and downhole formation. Bacterial growth inhibition Inefficient oil removal

Removal Large bacterial growth growth Efficient Oil Minimal bacteria Permian Basin Pilot Testing Inlet and Outlet Samples two sets

Design of Full Scale Unit Based on 500 barrel Frac Tank 1050 gpm (36,000 bpd) water flow

Capacity:1-7 rows of media West Texas light crude 0.82 S.G. Designed for 50 mg/l out with 2000 mg/l inlet concentration with three rows of media Can add additional rows if necessary for more flow or lower effluent Frac Tank Based Separator

Flow rate approximately 36,000 bpd Frac Tank Based Separator Permian Basin Installation Full Scale Unit Operations Test Results, Full Scale Unit Inlet Hydrocarbon

Concentration Outlet Hydrocarbon Concentration 90 mg/l 13 mg/l 85 mg/l

119 mg/l 14 mg/l 7 mg/l Coalescing Plate Systems Gravity operated High efficiency Predictable oil removal Design for whatever maximum effluent is allowed

Much smaller than other separators for same flow rate Plates are not consumed last years Recovered oil can be sold How is Maintenance Improved?

Extend periods between filter changes Reduce filter change cost and labor Reduce wear and tear on injection pump Reduce downhole plugging and workover requirements Reduce plugging due to oil in injection water Reduce plugging due to bacterial growth Summary and Conclusions

Recover oil that would otherwise be lost Minimize plugging of final filter reduce filter changes Reduce plugging of disposal well by oil Reduce plugging of well by bacteria Improve operations and reduce workover and maintenance requirements DESIGNING SALTWATER DISPOSAL SYSTEMS FOR

OPTIMAL OIL RECOVERY AND MINIMUM MAINTENANCE Questions? If you would like a transcript of this presentation, please leave your business card and I will send one.

Recently Viewed Presentations

  • Dual Credit Program Presented by Phylicia Bazile Special

    Dual Credit Program Presented by Phylicia Bazile Special

    What is CougarWeb? CougarWebis an online portal that includes all of the information and access to services that students need, while attending Collin College. Add/Drop Class. Online Trainings. CougarMail Email Account. Paying for Tuition . Access Online Courses (Canvas) Check...
  • Synoptic Data-Driven Quality Improvement Initiative <insert ...

    Synoptic Data-Driven Quality Improvement Initiative <insert ...

    Disclaimer. The results and conclusions are those of the authors and no official endorsement by Manitoba Health, or other data providers is intended or should be inferred.
  • NIST Spectroscopic Research on Heavy Elements 2005 - 2009

    NIST Spectroscopic Research on Heavy Elements 2005 - 2009

    NIST Spectroscopic Research on Heavy Elements 2005 - 2009 Wolfgang L Wiese National Institute of Standards and Technology (NIST), USA * * * * * * * * * * * * * * General Objective: Determine experimentally and theoretically...
  • Mcrud Michigan Coalition to Reduce Underage Drinking Ken Dail ...

    Mcrud Michigan Coalition to Reduce Underage Drinking Ken Dail ...

    Michigan Coalition to Reduce Underage Drinking (MCRUD) Ken Dail Coordinator (800) 968-4968 [email protected] Who is MCRUD? Who is MCRUD? MCRUD Steering Committee Volunteer Meets monthly Made up of agencies, organizations, and individuals Sets policy and makes decisions Hears from Regional...
  • Mat in a tribal health clinic - NPAIHB

    Mat in a tribal health clinic - NPAIHB

    MAT is Extremely rewarding. All the resources you need already exist. Once the patient is stable with their dosing, the visits are uncomplicated. Some patients are not ready. the Infectious Disease team. All of the. The buprenorphine provider and. Cherokee...
  • Relations and Functions - pendleton.k12.ky.us

    Relations and Functions - pendleton.k12.ky.us

    Learning Target: I can determine if a relation is a function. Bell Ringer Use f(x)=2x +4 f(3) = f(-5)= f(x)=10 Relations and Functions Vocabulary Relation—set of ordered pairs Ex: (x,y) Domain—set of first coordinates of the ordered pairs (x's) Range—set...
  • real-time embedded systems - Arizona State University

    real-time embedded systems - Arizona State University

    A simple library to control gpio pins. gpio_func.c and gpio_func.h. mraa library (libmraa) a C/C++ library to interface with the I/O on Galileo, Edison & other platforms, with a structured API where port names/numbering matches the board. mraa_gpio_context. gpio; gpio...
  • AP World History: Globalization - Forest Hills High School

    AP World History: Globalization - Forest Hills High School

    Since labor is cheaper in Mexico, many manufacturing industries moved part of their production... Between 1994 and 2002, the U.S. lost 1.7 million jobs, gaining only 794,00, for a net loss of 879,000 jobs. Nearly 80% of these jobs were...