CITY OF GLENDALE, CA APRIL 2, 2015 BRAND

CITY OF GLENDALE, CA APRIL 2, 2015 BRAND

CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT Concrete ConcreteImprovements Improvements Sewer SewerMain

MainPipe PipeImprovements Improvements Street StreetPavement PavementRehabilitation Rehabilitation Traffic TrafficSignal SignalModifications Modifications Signing Signingand andStriping Striping

Construction ConstructionPhasing/Scheduling Phasing/Scheduling Public PublicNotification NotificationProcess Process LOCATION MAP BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT ANTICIPATED CONSTRUCTION START DATE:

September 2015 PROJECT DURATION: 100 Working Days (About 5 Months) barring any unforeseen conditions RESOURCEFUL FACTS - R&R (Remove & Replace) ARHM (Asphalt Rubber Hot Mix) AC (Asphalt Concrete)

VCP (Vitrified Clay Pipe) ADA (Americans with Disabilities Act) REASONS FOR PROJECT Need to increase pipe size of the Sewer Collector on San Fernando Road, Gardena Ave and Tyburn Street Age of Existing Sewer Pipe Repair Broken Sidewalk, Driveways and other PCC Improvements Repair Deteriorated Roadway Pavement Conditions ( Completes San Fernando Road and Brand Boulevard South of San Fernando Road) BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER

AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT CONCRETE IMPROVEMENTS Selective R&R of Uplifted and Damaged: -Sidewalks -Curb Ramps -Curb/Gutter -Driveway Aprons -Upgrade Curb Ramps with ADA Compliance Before

After BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT SEWER MAIN PIPE IMPROVEMENTS A. New Sewer line/Pipe Upgrade/Replacement Central Ave, San Fernando Road, Brand Blvd, Vassar Ave, Topock St, Gardena Ave, Tyburn St. Remove Existing Sewer Pipe and Replace with New Larger Pipe at Same Location

Install New Sewer Pipe Open Trench/ 2 Lanes will be Occupied During Construction BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT STREET PAVEMENT REHABILITATION PAVEMENT GRINDING (AKA Cold Mill/ Surface Plane) Remove Existing Deteriorated AC Pavement

Grinds will be Hauled Away Full Lane Grinding Can Drive on Immediately after Grinding BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT STREET PAVEMENT REHABILITATION RUBBERIZED (ARHM) PAVEMENT OVERLAY Place 1.5 the ARHMRide

Overlay Over Base Pavement Improves and Structural Integrity of Compact Newly Placed Pavement the Roadway Eco-Friendly (Uses Tires) Begins NEW Service Life for Pavement Quieter and Smoother Ride Better Road Friction

TRAFFIC SIGNAL IMPROVEMENTS - Traffic Signal Modifications - Striping and Signing BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT TRAFFIC SIGNAL MODIFICATIONS A. Relocate Existing Signals at San Fernando Road and Brand Boulevard B. Upgrade Signal and Pedestrian Indications at San Fernando Road and Brand Boulevard

BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT SIGNING AND STRIPING Install New Signing and Striping to Comply with New CALTRANS Standards New Pavement Markings, Lane Lines, Curb Markings, Retro-reflective Pavement Markings

Installation of New Fluorescent and High Intensity Signing for Improved visibility Installation of Bike Lanes on Brand Boulevard between San Fernando Road and the City of Los Angeles to Connect to the Existing Bike Lanes in Los Angeles BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT ANTICIPATED CONSTRUCTION PHASING Phase 1a:

Sewer Improvements Phase 1b: Traffic Signal Modifications Phase 1c: Concrete R&R Phase 1a, 1b and 1c Will Not Occur Simultaneously within Several Blocks of Each Work Phase 2:

Pavement Grinding / Rubberized Pavement Overlay Phase 3: Utility Covers Adjustment to Finished Grade Phase 4: Striping and Pavement Markings, Sign Installation CONSTRUCTION WORK WILL BE COORDINATED TO MINIMIZE IMPACT TO LOCAL BUSINESSES & TRAFFIC

BRAND BLVD, GARDENA AVE & ADJACENT STREETS - SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD CROSSING IMPROVEMENT PROJECT Befor e After For questions or general information, please contact: Saumil Mody Project Manager (818) 548-3945 Yvonne Guerra

::THANK YOU:: Community Outreach (818) 548-3945 Public Works Website: http://www.ci.glendale.ca.us/public_works This PowerPoint presentation will be available for viewing at : http ://www.glendaleca.gov/government/depart ments/public-works/projects/brand-blvd-an d-adjacent-street-sewer-improvements .

The project-dedicated webpage includes project updates and other information.

Recently Viewed Presentations

  • Dear PowerPoint®* Users,

    Dear PowerPoint®* Users,

    In both examples, Distributor A would qualify to Qualified Producer on the first of the month after the qualification was achieved. 1,500 PPV + 1,000 DLV = 2,500 PV SUCCESS BUILDER at 42% 400 PPV + 600 DLV = 1,000...
  •   -,  ,  , A prebiotic is a non-digestible

    -, , , A prebiotic is a non-digestible

    Micrococcaceae a Ps. aeroginosa a HARMFUL BENEFICIAL СЪСТАВ НА КУЛТИВИРУЕМАТА МИКРОФЛОРА В ЧОВЕШКОТО ДЕБЕЛО ЧЕРВО, [по Puhan, 1999] Predominant colonic microorganisms categorized into potentially harmful or beneficial groups DEFINITION FOR PREBIOTICS
  • Studies of K± decays with the KLOE experiment

    Studies of K± decays with the KLOE experiment

    T0 global (tag): resolution T0 global: non tagged events K± ± 0 0 : Dalitz plot parameters Conclusions and Outlook TAG TAG TAG TAG KPM Selection Selection Efficiency KPM retracking DST production Done In progress In progress To be done...
  • Learning to live in interesting times  what are

    Learning to live in interesting times what are

    (building on Noel Gough, 1990) Problems with these approaches to the future. ... Industrialisation - Electric light, phonographs, wireless cinema, early globalisation, mass production. ... Slide 1 Last modified by:
  • Joshua and the Israelites take Jericho - Bible.org

    Joshua and the Israelites take Jericho - Bible.org

    Joshua and the Israelites take Jericho Author: Jodi Hooper Last modified by: ... Arial MS Pゴシック Verdana TradeGothic Verdana PS Times Blank Presentation The Good Samaritan PowerPoint Presentation PowerPoint Presentation PowerPoint Presentation PowerPoint Presentation PowerPoint ...
  • People are talking about itin social media-Twitter, Facebook,

    People are talking about itin social media-Twitter, Facebook,

    College Stresses… College academics and finances can be a huge burden on students. In a study commissioned by Inceptia.org, four of the top five stressors for students were financial in nature.
  • Myopathies - WordPress.com

    Myopathies - WordPress.com

    Infectious causes of myopathy Trichinosis Cysticercosis Toxoplasmosis HIV Coxsackie A and B Influenza Lyme Staphylococcus aeurus Endocrine myopathies Endocrine myopathies Thyrotoxic myopathy Hypothyroidism Hyperparathyroidism Adrenal insufficiency Hypokalemia Toxic myopathies Drugs aimed at reducing blood lipid levels statins, clofibrate ...
  • The Victorian Period - PC\|MAC

    The Victorian Period - PC\|MAC

    The Hungry Forties. 1st decade of Queen Victoria's reign was troubled. She came to the throne in the first year of a depression. 1.5 million unemployed workers (out of 16 million people)were on some form of relief