SVT Installation and Commissioning

SVT Installation and Commissioning

SVT Installation and Commissioning Takashi Maruyama, SLAC HPS Collaboration Meeting June 16-18, 2014 SVT Installation Now 85.00 50.1 SVT 58 Now 85.00

SVT Installation Steps: 1. Separate top/bottom ECal and move downstream Remove ECal vacuum chamber 45 cm 2. Remove upstream beam pipe, PS vac flange; move Frascati upstream 3. Set up survey instruments upstream and downstream of PS vac chamber Does the instrument fit in 45 cm? 3 SVT Installation Steps: 4. Put SVT box on table and slide into PS vac chamber and bring to correct Z SVT

5. With surveyors, position SVT horizontally and vertically at downstream end; ditto upstream end. 6. Lock SVT Box in place 7. Survey location of PS vac inner surfaces, SVT box outer surfaces, SVT fiducials, check points. 4 SVT Installation Steps: 8. Install SVT vac box 9. Connect mover and target rods. Set hard stops and limit switches. Verify movers work. Check alignment with survey. 10. Connect cooling lines and test 11. Connect data/power cables and test 12. Remove upstream table; restore upstream Frascati position. 13. Restore vac connections: Upstream Beampipe, Ecal Vac chamber. 14. Pump down and Test Vacuum As the linear stage moves, the limit switches may need adjustments.

15. Leave the SVT L1-3 at fully retracted position 16. Test cooling and data/power in vac 17. Replace Ecal and test Survey Information on the vacuum chamber Survey information wrt the straight-through beamline. X position of vac chamber wall on beams right at upstream and downstream ends Y position of vac chamber wall on bottom surface at upstream and downstream ends Z position of the upstream flange mating surface at 4 corners. Vac chamber z z zy 8.8

5 cm yz Straight-through beam line 6 SVT Alignment Alignment spheres: Two at the top and one at the bottom of the base plate upstream and downstream. End of the top and bottom rods. Adjustment screws: 7

SVT Commissioning SVT Commissioning will be performed under the following conditions, SVT Protection Collimator is in the 3 mm gap and the FSD system is working. SVT Layer 1 is retracted to 3 mm from the beam. SVT bias voltage is set to 60 V. Efficiency is nearly 100% and high voltage punch-through damage to the front-end electronics can be avoided. SVT Chiller is running and temperature interlock is working. 8 Slow Control Power to the front end and flange boards

High voltage bias Hybrid power Hybrid and front end board temperatures Chiller temperature 9

SVT Calibration Extraction of the pedestals and noise for each of the 23004 channels Extraction of the gains and offsets Runs at different t0 values to study the pulse shape SVT calibration can be done without beam, but it will be repeated with beam to make sure there is no beam-related anomalies.

10 Timing in the SVT Correctly timed in hits Well controlled latency scan Single cluster trigger (or an OR of top & bottom) Background Low beam current to get single Ecal clusters for good reference time and no background No pile-up pulse shape cuts in SVT (noise hits should be few) Take runs with latency at 50-75ns steps

Observable Effect from latency scan ECal SVT hit time (Ecal time above uses MC truth time ) ECal vs SVT hit time Fitted amplitude (vs t0) Amplitude lower when fitting tail. Count samples (among the six) above some threshold Rudimentary way of seeing increased occupancy.

Strip/3D hits per event Broad peak around correct latency Tracks per event Broad peak around correct latency (probably using non-bend plane view as well) We are producing these scans with MC to check (Omar) 11 Online monitor

Occupancy Shaper signal samples Data rate DAQ Errors Occupancies from Test Run 12

Event display and hit efficiency Find tracks Efficiency for finding hits on tracks should be >99% 13 Conclusions SVT installation procedure is being developed. Details still need more work. - If we have to extract L1-3 for repair, how can we do that? - If we have to extract L4-6, is it possible to extract from downstream?

SVT alignment and survey need more attention. Software for SVT commissioning are being developed. Slow control Software for Timing-in On-line monitor Event display 14

Recently Viewed Presentations

  • Financial Accounting and Accounting Standards

    Financial Accounting and Accounting Standards

    Offsetting such opposition is the need for greater transparency in financial reporting. Simple Structure -- Only common stock; no potentially dilutive securities. Complex Structure -- Potentially dilutive securities are present. "Dilutive" -- Ability to influence EPS in a downward direction....
  • Spoiled for Choice 4 - Speech-Language Therapy

    Spoiled for Choice 4 - Speech-Language Therapy

    Author: Caroline Bowen Created Date: 04/27/2010 21:13:10 Title: Spoiled for Choice 4 Last modified by: CB
  • Metals and Oxidative/Nitrosative Stress oxidative/nitrosative stress: high levels

    Metals and Oxidative/Nitrosative Stress oxidative/nitrosative stress: high levels

    Metals and Oxidative/Nitrosative Stress oxidative/nitrosative stress: high levels of ROS (Reactive Oxygen Species) and RNS (Reactive Nitrogen Species) such as free radicals and peroxides which damage cellular components (DNA, proteins, lipids)
  • Hidden Markov Models

    Hidden Markov Models

    Hidden Markov Models Dave DeBarr [email protected] Overview General Characteristics Simple Example Speech Recognition Andrei Markov Russian statistician (1856 - 1922) Studied temporal probability models Markov assumption Statet depends only on a bounded subset of State0:t-1 First-order Markov process P(Statet |...
  • Learning Methods - Andragogy and Pedagogy

    Learning Methods - Andragogy and Pedagogy

    PPP. Presentation - Practice - Production, or PPP, is a method for teaching structures in a foreign language. As its name suggests, PPP is divided into three phases, moving from tight teacher control towards greater learner freedom.
  • Presentation title - cdn-s3.sappi.com

    Presentation title - cdn-s3.sappi.com

    Forward-looking statements and Regulation G. Forward-looking statements. Certain statements in this release that are neither reported financial results nor other historical information, are forward-looking statements, including but not limited to statements that are predictions of or indicate future earnings, savings,...
  • Proposed Texts for Functional Requirement Document Draft

    Proposed Texts for Functional Requirement Document Draft

    굴림 Arial Times New Roman 맑은 고딕 802-11-Submission Proposed Texts for Functional Requirement Document Draft Service Coverage Extension Straw Poll Suggested Text for Functional Requirement Document Draft Straw Poll
  • The powers of Congress - Loudoun County Public Schools

    The powers of Congress - Loudoun County Public Schools

    Checks and Balances of the legislative Branch. Each of the 3 branches of the national government limits the power of the other 2 branches. 1. Congress checks the power of the president when legislators: